Building Construction Industry Challenges
In the field...
- The paper plans come out
- Leaving the 3D Model in the office - Traditional manual methods are often used for layout
- Manually scaling distances and calculating angles from plans
- Turning angles with theodolites and pulling tapes to measure distance
Project Lifecycle and BIM
- Traditional project delivery tends to focus the greatest amount of effort during the construction documentation phase
- At this point in the project lifecycle, much of the design has already been developed, but input from the construction team about costs and schedule lead to significant design changes
- Trend – integrated project delivery promotes greater collaboration earlier in the project lifecycle
- Emergence of BIM technology is further promoting this shift as collaborative modeling tools become available – savings valued ~3% of the entire construction value
Other info McGraw Hill “2007 Interoperability Issue”
Trimble – "Bringing BIM to the field"
Accurate Model Data
Trimble Field Controller
Used directly in the field with a Trimble robotic total station